Fitting Out, Alterations and Additions 裝修、改建及加建工程

Fitting Out, Alterations and Additions 裝修、改建及加建工程 KCTang

Go to End

(newer projects first)

(較新項目排先)

  1. Proposed Alteration and Addition Works for Octa Tower

    傲騰廣場裝修改建工程

  2. Fitting Out Works for Bar and Club at Silver Fortune Plaza, Wynham Street

    雲咸街荊威廣場酒吧裝修工程

  3. Interior Fit-out, Addition and Alteration Works to Movie Town at New Town Plaza

    新城市廣場MCL戲院裝修改建工程

  4. Fitting Out Works for Art Gallery at H Queen's, 80 Queen's Road Central

    皇后大道中80號H Queen's 畫廊裝修工程

  5. Addition and Alteration Works to Residential Building at 4 Headland Road, Hong Kong

    香港南灣赫蘭道4號住宅加建及改建工程

  6. Interior Fit-out, Addition and Alteration Works for MCL Cinema at Lai Sun Commercial Centre

    麗新商業中心MCL戲院裝修改建工程

  7. Interior Fit-out, Addition and Alteration Works to MCL Telford Cinema at Telford Plaza

    MCL德福戲院裝修改建工程

  8. Revitalization of Gold Peak Building at 30-34 Kwai Wing Road, Kwai Chung

    葵涌葵榮路30-34號金山工業中心活化工程

  9. Signage Improvement Works for The Education University of Hong Kong

    香港教育大學標誌牌改善工程

  10. Interior Fit-out, Addition and Alteration Works to Grand Kornhill Cinema at Kornhill Plaza

    康怡戲院裝修改建工程

  11. Fitting Out Works for Proposed Telephone Exchange Centre at 2/F (North), Hutchison Logistics Centre at 18 Container Port Road South, Kwai Chung

    和記物流中心電話轉換中心裝修工程

  12. Interior Fit-out, Addition and Alteration Works to Festival Grand Cinema at Festival Walk

    又一城MCL戲院裝修改建工程

  13. Addition and Alteration Works of Hecny Group Building at No. 111 Wai Yip Street

    偉業街111號均輝集團大廈翻新工程 

  14. Maxim’s Food Factory Renovation Project (Phase 3) at 14 Dai Fu Street, Tai Po Industrial Estate, N.T.

    美心大富街食品工廠第三期翻新工程

  15. Renovation of Basement and Ground Floor of Provident Square

    和富薈地庫及地面翻新工程

  16. Fitting Out, Addition and Alteration Works at 3/F New Town Mansion Shopping Aracde, Tuen Mun

    屯門新都中心三樓精裝修,加建及改造工程

  17. Renovation Works for Retail Podium at Andes Plaza at Sheung Wan

    上環安逹中心零售層翻新工程

  18. Major M&E Plant Replacement for Hong Kong Exchange Square

    香港交易所主要機電設備更換工程

  19. Renovation Works of Corporate Customer Services Centre at BOCC 11/F

    中銀大廈11樓企業顧客服務中心裝修工程

  20. Refurbishment, Alteration and Improvement to Candy Novelty House at 164 Wai Yip Street, Kwun Tong

    觀塘偉業街164號凱康大廈翻新工程

  21. Fitting Out Works for URA’s New Office in Western District

    市區重建局西區辦公室裝修工程

  22. Interior Fit-out Addition and Alteration Works to MCL Metro Cinema at Metro City Plaza II

    新都城MCL將軍澳戲院裝修改建工程

  23. IT Infrastructure at Hong Kong Red Cross New Headquarters

    香港紅十字會新總部大樓資訊科技基礎建設工程

  24. Repartitioning Works to Level 3 of Ma On Shan Plaza

    馬鞍山廣場第三層重配店舖工程

  25. Fitting Out Works of the URA’s Property Management Office and Kwun Tong Resource Centre at Yue Man Square, Kwun Tong

    市區重建局物業管理處及觀塘資訊中心裝修工程

  26. Partial Demolition to Li Shu Fan Block, Hong Kong Sanatorium & Hospital

    養和醫院李樹芬院部份拆卸工程

  27. Proposed Hospital Canteen on 4/F Li Shu Pui Block, Hong Kong Sanatorium & Hospital

    養和醫院李樹培院飯堂裝修工程

  28. Proposed Footbridge and Alteration and Addition Works at Nexxus Building

    盈置大廈加建行人天橋及改造工程

  29. Fitting out, Alteration and Addition Works at Heraeus Technology Centre
    賀利氏科技中心翻新裝修工程
  30. Fire Safety Improvement Works to Alexandra House for The HongKong Land (Property Management) Ltd.

    中環歷山大廈 – 消防安全改善工程

End of Page